This leads to radically rethink of everything. Not the Units, Racks, Power, Datacenter, Floor Space, even Cooling and Grid Power Distribution.
You could have a 1000 Racks, which isn't that many racks for Datacenter and it would be 1GW.
The current largest solar farm only does 2.2GW and it is about 56km2.
I wonder if we could built 1TW datacenter.
ksec•16h ago
This leads to radically rethink of everything. Not the Units, Racks, Power, Datacenter, Floor Space, even Cooling and Grid Power Distribution.
You could have a 1000 Racks, which isn't that many racks for Datacenter and it would be 1GW.
The current largest solar farm only does 2.2GW and it is about 56km2.
I wonder if we could built 1TW datacenter.