Though that only moves the needles from impossible to laughable.
> If our goal is to double our grid and build a low-carbon economy in less than 25 years, there is no credible plan to do that without nuclear energy
There are plenty of credible plans, they all involve wind and solar. But as anyone watching clean energy news will know, Alberta is trying its hardest to get rid of all wind and solar development from the province.
As for the baseload argument, they already get >60% of the electricity from hydro and nuclear. How much more baseload do you really need? 100%?
The high-profile project cancellations people point to weren't a government ban. They happened because the province changed its transmission rules. Previously, ratepayers subsidized the massive utility costs required to connect remote wind and solar farms to the central grid. The province ended this, forcing private developers to internalize their own grid connection costs. Once forced to pay for their own infrastructure, highly speculative, unfinanced projects simply became economically unviable and dropped out of the queue.
If a private wind or solar developer wanted to build a massive farm in a remote, rural area (like Southern Alberta) where land is cheap but high-voltage power lines do not exist, they only had to pay for the immediate wire connecting their project to the nearest local substation. Taxpayers were subsidizing those players, because it was a "load pays" system.
Please do not fall pray to the general trope that Alberta is a backwards hillbilly province. Subsidizing private developments with public money is not something that should be encouraged.
On Canada broadly, you are correct in your baseload numbers and I agree with you.
(Energy trader here)
- one of the largest uranium reserves
- a well respected and safe nuclear design in CANDU
- experience with building and refurbishing nuclear reactors(Darlington)
and for Ontario itself A need for more baseload to work with the large amount of solar and wind that Ontario has added in the last 10 years.
Saskatchewan also now has a potential need for nuclear for industrial use now that wasn't present before from its existing population.
if the government can clear the red tape by using a well tested reactor design then they could certainly get some of these reactors built in that time frame.
15 seems...ambitions, but if we're going to spend at a federal level this is probably one of the better things to invest in.
If they can make them cookie cutter as much as possible and not unique snowflakes like has been the pattern at least in the US, they can probably do it both on the timeline and a somewhat reasonable cost basis
If they build 15 individual projects instead of managing this as a single big project, yeah that is very ambitious
Wind and solar could be deployed for a fraction of the proposed $100 billion investment and should be considered as part of the interim solution, while nuclear remains a long-term strategic project.
Rather than pursuing such an ambitious build out, a more practical approach might be to scale back the plan and focus on constructing one reactor each in Alberta, Saskatchewan, and Manitoba as an initial phase.
Canada has also regularly refurbished their CANDU reactors, which are large multi year projects. And they do it on-time and under budget
https://www.world-nuclear-news.org/articles/renewed-bruce-3-...
As in the UK we were previously asking a French-Chinese partnership to build here so not sure why Canada didn’t get chosen for that.
What other kind of subsidy is there?
This as well as the failed pipeline projects have made Canadian infrastructure projects very high risk from a lending perspective, becuase there's now a non-insignificant risk that a province can welch out of financing a deal purely for short term political gain.
This announcement is a good announcement, but it's just bluster if the entire ecosystem around liability and policy stability isn't managed.
[0] - https://thenarwhal.ca/alberta-renewable-energy-investment-co...
bluefirebrand•1h ago
Canada seems just absolutely inept at building infrastructure like this. Calgary's green line was supposed to be finished in 2025, and it's barely been started. I don't think they've even laid a single line of track.
This country is kind of a joke :/
ex1fm3ta•1h ago
ttul•1h ago
As a Canadian, I think Canada’s primary hurdle is not a lack of engineering competence, but rather political volatility. Projects like Calgary’s Green Line often suffer from shifting scopes, fragmented authority, and delayed funding. Conversely, the recent Darlington nuclear plant refurbishment finished early and under budget. This proves that Canada can successfully execute megaprojects when planning is front-loaded and standardized.
Another comment I'd make is that the Carney government is only just a bit more than one year old. They're writing a whole lot of new policy. Will they succeed more than past governments? Who knows. But, at least they're spending the majority of their political capital trying to build stuff.
badc0ffee•1h ago
The city sat on their hands for years, perfecting and re-routing the downtown part[1]. Eventually, the plan was shortened to 16 Ave N to Shepard with a long tunnel downtown. The city ordered $100s of millions of low-floor trains, incompatible with the existing ones, necessitating building a new maintenance facility. The cost at this point was $5.something billion.
Then, in 2020, the provincial government put a "pause" on the project. When it came back to life, costs had increased dramatically, and the city came out with a modified plan the (the $6.8 billion stub train from downtown to Lynnwood). The province then threatened to pull their part of the funding, and commissioned a new downtown segment plan that advocated for elevated downtown, and nothing north of there.
Today? We are building the original truncated south phase to Shepard (by 2031!), but not the downtown part. The city is still debating what's going to happen downtown, dismissing elevated. They are hearing from office building and parking lot owners who are worried about its effect on property values, but I think they are also rejecting any ideas from the province on principle. About the only positive thing I can say is that the project is tangibly under construction now, with actual bridges over roadways done or nearly complete.
I blame the city (both planners and elected officials) and the province in that order, but mostly the city.
[1] One positive thing to come from that is the routing in Inglewood/Ramsay and 26 Ave SE that avoids taking down heritage buildings and destroying a vital community corridor.