frontpage.
newsnewestaskshowjobs

Made with ♥ by @iamnishanth

Open Source @Github

fp.

Open in hackernews

Microsoft pulls plug on plans for 244-acre data center in Caledonia

https://www.tmj4.com/news/racine-county/microsoft-pulls-plug-on-plans-for-244-acre-data-center-in-caledonia-after-community-pushback
36•cdrnsf•2h ago

Comments

marticode•51m ago
Well my IP (regular plain residential Asian ISP) is blocked on this site. Zealous Cloudflare-blocking is breaking the web.

(also thanks for the useful message telling me to "contact the website owner... while blocking me from the website where the contact info should be)

kogasa240p•40m ago
Microsoft has decided not to move forward with its proposed site for a data center in the Village of Caledonia after facing significant community pushback from residents. Posted and last updated

VILLAGE OF CALEDONIA, Wis. — Microsoft has decided not to move forward with its proposed site for a data center in the Village of Caledonia after facing significant community pushback from residents.

PREVIOUS COVERAGE | Microsoft data center proposal continues to divide Caledonia residents as rezoning plans move forward

“Based on the community feedback we heard, we have chosen not to move forward with this site,” a Microsoft spokesperson said in a statement Wednesday.

The tech giant’s decision comes after hundreds of residents voiced opposition to the project over recent weeks. More than 2,000 people signed a petition opposing a rezoning proposal that would have allowed the data center to be built on 244 acres of land.

Watch: Microsoft pulls plug on plans for 244-acre data center in Caledonia after community pushback

The proposed site was situated on County Line Road and State Highway 32, southwest of the WE Energies Oak Creek Power Plant, and was surrounded by farmland and residential properties.

47032805-Concept Site Plan - Project Nova by TMJ4 News

Despite abandoning this particular location, Microsoft indicated it remains interested in investing in Southeast Wisconsin.

The spokesperson said the company looks forward to “working with the Village of Caledonia and Racine County leaders to identify a site that aligns with community priorities and our long-term development goals.”

TMJ4’s Jenna Rae, who has been following this story, reached out to Todd Willis, the village administrator, who provided the following statement:

    “Nothing official has been submitted to the Village regarding their pending application, and have no comment until such time.”
- Todd Willis, Village Administrator

Resident Prescott Balch told TMJ4 that his phone did not stop ringing on Wednesday morning, as people delivered the news. PRESCOTT BALCH TMJ4 Prescott Balch lives in Caledonia. Balch welcomed the news that Microsoft is changing plans to bring a data center in the area.

"We're ecstatic that those arguments held water and ultimately convinced a large corporation to back off, so great day here in Caledonia," Balch said.

Village trustee Nancy Pierce says she learned about the change from a news article.

"I have a lot of respect for Microsoft, making the decision when they say they listened to the constituents. They also listened to board questions both at the planning commission at the board level. I believe that they took a lot of different pieces of information into play," Pierce stated. Nancy Pierce TMJ4 News Nancy Pierce is a village trustee in Caledonia.

Both Pierce and Balch made it clear that they are not opposed to working with Microsoft in Caledonia.

As the tech giant looks for a new site, there is hope that there are improvements to the overall process.

"I would’ve liked to been able to engage directly with Microsoft much earlier in the process. We were not allowed to do that. I think that became an obstacle for a lot of different points and reasons," Pierce explained. "I feel like now they would come forward much quicker and engage directly with the community, really get to understand the community."

"There are people that have an opinion about what they want to do with their village, and that was absent in this to me. That's the real message of this thing," Balch explained. "Let's help Microsoft find the right spot in southeast Wisconsin."

arjie•35m ago
What is the actual procedure through which this happens? You buy the land and then are granted permission on a discretionary basis? It seems to me that if you were a small business this becomes much harder to participate in because you need to acquire and hold the unproductive asset.

This would mean that land use tends towards that which large firms (which can sustain the costs easily by self-financing) find useful.

delfinom•13m ago
Zoning laws. Many parts of the US but not all have land use zoning. The zoning for any property you buy is public record, so any business knows well in advance of what they are buying. If you want to deviate from the zoning you have to submit an application for that zoning variance which requires usually a community hearing.

Neither small or large businesses really have any big advantages here. Got to win over the community. If anything, the small business may be local and the operators more readily able to convince the community for a variance than some corporate lawyer.

bobthepanda•5m ago
Also for a large enough utility hookup you will need to coordinate with the utility and or government since you can’t just plop down a large consumer on any old power line or pipe.
toast0•9m ago
Depending on things, you might enter a land purchase (or lease) contract that's contingent on issuance of a building permit.

But a seller would probably prefer to sell without contingency, so what terms are available depends on market conditions.

Title insurance for residential real estate may sometimes cover properties that are unbuildable due to unsatisfiable permit requirements.

All told, it's easier as a buyer if you purchase an existing structure that was built under permits and is currently in use under appropriate occupancy permits.

delecti•35m ago
My first reaction is that 244 acres for a data center sounds absolutely obscene. But I have to admit that I'm coming from a place of ignorance.

How big "should" a data center be? How big are some other data centers? How big is us-east-1, for an example of a large one? I'm finding this to be rather difficult information to google.

jeffbee•28m ago
Almost all of the site would have been open space, existing transmission corridors, an electric substation, and two flood control ponds they threw in to try to sweeten the deal by offsetting the new impermeable surfaces. The data halls are a small portion of the site.
jubilanti•25m ago
I assume you mean AWS us-east-1. It isn't a single data center. It is a cluster of data centers around Northern Virginia.
manarth•20m ago
That's the land allocation rather than the building-size / data-centre size.

The average data centre is 10,000 square metres (2.5 acres).

As well as compute and network facilities, DCs also need to accommodate parking, personnel areas, cooling, fire-suppression, power substations, power redundancy (generators), ground-security…

244 acres is absolutely at the upper end of any DC site.

LeFantome•10m ago
us-east-1 is a region. That means that it is 3 to 6 “availability zones” within a 100 km or so. Each of these availability zones consists of a cluster of data centers. Each cluster is perhaps 3-5 that are a few km from each other. The data centers will have tens of thousands of servers each.

So that is the mental model you should have for “how big is us-east-1”. But also, the data centers are not going to be, individually, anything like 244 acres. Best guess is that individual data centers are between 200,000 and 400,000 square feet. That is 5 to 10 acres.

Do the math above and us-east-1 may be 300 acres of floor space spread over a very large area.

jeffbee•34m ago
Wealthy white exclave succeeds in using environmental justice language to keep cheap coal-fired power to themselves. Very American outcome.

Although I obviously don't care about Microsoft's outcome here, this was clearly a great site at the intersection of two transmission lines and with essentially infinite water resources.

trollbridge•21m ago
Some of us would like to keep our “infinite” water resources which actually aren’t infinite.

I live beneath two transmission lines (overlapping, I guess, but not intersecting) and would prefer no data centre built here. Why? Because it will provide me no benefit whatsoever, reduce my property value, and worsen my quality of life due to things like light pollution and noise.

If data centre operators would fix these things perhaps people would feel differently. For example - provide multi gigabit fibre Internet to everyone nearby.

jeffbee•12m ago
I support in principle the rights of towns to set their own land use rules, but on the larger societal picture I don't support people benefiting from things like intermodal shipping, goods distribution, and information services that they refuse to host. So I perceive a certain hypocrisy in this story.
rbanffy•21m ago
For a moment I thought they were referring to the Scottish Highlands...

Search engines alternatives now that Google isn't Google anymore

https://techcrunch.com/2026/05/21/six-search-engines-worth-trying-now-that-google-isnt-really-goo...
377•elorant•2h ago•310 comments

Netherlands Seizes 800 Servers, Arrests 2 for Aiding Cyberattacks

https://krebsonsecurity.com/2026/05/netherlands-seizes-800-servers-arrests-2-for-aiding-cyberatta...
66•jruohonen•1h ago•6 comments

Magnifica Humanitas (Encyclical Letter)

https://www.vatican.va/content/leo-xiv/en/encyclicals/documents/20260515-magnifica-humanitas.html
430•theletterf•5h ago•173 comments

C extensions, portability, and alternative compilers

https://lemon.rip/w/6-c-extensions-compilers/
24•xngbuilds•1h ago•2 comments

Pope Leo XIV says AI must serve humanity, not the powerful few

https://religionnews.com/2026/05/25/in-his-first-encyclical-pope-leo-xiv-says-ai-must-serve-human...
175•benwerd•2h ago•73 comments

2026 HIPAA Security Rule Update

https://medcurity.com/hipaa-security-rule-2026-update/
36•mooreds•1h ago•20 comments

Hive (YC S14) is hiring sr back-end developers (CA/US remote OK)

https://jobs.ashbyhq.com/hive.co/538c47f9-d008-49b7-b0d4-583d9294a481
1•patman_h•45m ago

Launch HN: Chert (YC P26) – Twilio for iMessage

https://www.trychert.com
2•garygao•5m ago•0 comments

Leave Me Behind

http://androidessence.com/leave-me-behind/
166•mooreds•3h ago•129 comments

IBM Spins Off the First Pure-Play Quantum Chip Foundry

https://futurumgroup.com/insights/2-billion-chips-act-investment-in-quantum-bets-on-ibms-300mm-su...
67•rbanffy•5h ago•18 comments

Pope Leo: opaque AI run by few firms risks "New Forms of Dehumanization"

https://variety.com/2026/biz/global/pope-leo-ai-encyclical-algorithms-threaten-dehumanisation-123...
59•embedding-shape•2h ago•3 comments

Didgeridoo playing as alternative treatment for obstructive sleep apnoea (2006)

https://pmc.ncbi.nlm.nih.gov/articles/PMC1360393/
222•kelseyfrog•2d ago•106 comments

Microsoft pulls plug on plans for 244-acre data center in Caledonia

https://www.tmj4.com/news/racine-county/microsoft-pulls-plug-on-plans-for-244-acre-data-center-in...
36•cdrnsf•2h ago•15 comments

Show HN: Audiomass – a free, open-source multitrack audio editor for the web

https://audiomass.co/?multitrack=1
437•pantelisk•23h ago•95 comments

The physicists who convinced Fermilab to send Brazil's emails

https://buttondown.com/blog/brazil-fermilab-email
19•maguay•4d ago•6 comments

AI errno(2) values

https://www.netmeister.org/blog/ai-errno.html
60•zdw•3d ago•14 comments

DeepSeek reasonix, DeepSeek native coding agent with high caching and low cost

https://esengine.github.io/DeepSeek-Reasonix/
622•Alifatisk•1d ago•258 comments

Show HN: Geomatic – a command-driven geometry studio enabled with autodiff

https://www.tinyvolt.com/geomatic
40•nivter•6h ago•10 comments

Gnutella: A Protocol Outliving the World That Created It

https://rickcarlino.com/notes/p2p/gnutella-explanation.html
35•rickcarlino•3d ago•3 comments

Migrating from Go to Rust

https://corrode.dev/learn/migration-guides/go-to-rust/
372•jabits•20h ago•367 comments

White Rabbit – sub-nanosecond synchronization for large distributed systems

https://ohwr.org/projects/white-rabbit/
145•michaelsbradley•2d ago•33 comments

Notes about reading messages with the Python email packages

https://utcc.utoronto.ca/~cks/space/blog/python/EmailPackagesNotes
37•ankitg12•5d ago•1 comments

Bytecode VMs in surprising places (2024)

https://dubroy.com/blog/bytecode-vms-in-surprising-places/
79•azhenley•3d ago•27 comments

I spent 50 hours drawing a line graph

https://www.dougmacdowell.com/50-hours-to-draw-some-lines.html
592•dougdude3339•4d ago•95 comments

A fundamental principle of aeronautical engineering has been overturned

https://www.wired.com/story/a-fundamental-principle-of-aeronautical-engineering-has-been-overturned/
200•littlexsparkee•20h ago•100 comments

Jira Is Turing-Complete

https://seriot.ch/computation/jira.html
244•vinhnx•11h ago•108 comments

Rising seas will swallow New Orleans. People need to start relocating now

https://www.cnn.com/2026/05/25/climate/new-orleans-sea-level-rise-relocation
88•breve•5h ago•84 comments

Bug 1950764: Work Around Crash on Intel Raptor Lake CPU

https://phabricator.services.mozilla.com/D301917
135•luu•2d ago•45 comments

The Cost of Safetyism

https://stevemagness.substack.com/p/the-cost-of-safetyism
15•obscurette•48m ago•3 comments

Microsoft open-sources “the earliest DOS source code discovered to date”

https://arstechnica.com/gadgets/2026/04/microsoft-open-sources-the-earliest-dos-source-code-disco...
494•DamnInteresting•1d ago•179 comments