Ashburn has the infrastructure however. From what I'm reading, other places don't. So they bring in power on-site, and it seems to be much less regulated.
Also, noise regulations aren't good for this kind of constant tonal sound. Any facility like this should have to prove it can operate within a certain acousting footprint before it's built
walrus01•40m ago
This particular datacenter was retrofitted into an existing industrial building, there was some sort of industrial metalworking factory there previously. Structure dates to 1972.
The houses are basically right across the street from it. The noise does sound annoying as hell. This seems like a basic failure in local permitting/zoning to allow something this noisy without a significant empty buffer zone to any residences.
edit: it's here: https://www.google.com/maps/place/Dowagiac,+MI+49047,+USA/@4...
NAR8789•24m ago
cyberax•21m ago
Rebelgecko•15m ago
ckozlowski•11m ago
The pledge by their CEO to shut down crypto-mining equiptment feels like a deflection to me, because I don't think that's the source of the noise. It's the turbine generator, and switching to AI I don't think will change the power requirements any. We'll see I suppose.